Major Aviation Design Centre
Revenue
Employees
Duration
Engineering JV with a major global aircraft manufacturer for the design of passenger planes
Enercor was mitigating and resolving a conflict between shareholders while ensuring the company’s operations were running
as usual. Enercor was able to resolve the minority shareholder’s conflict with both majority shareholders thus
increasing the dividends more than tenfold. Enercor was also able to secure long term engineering contracts for the
JV and was then able to sell the minority shares at the required price to mutual satisfaction of all the parties
involved.
1-2 months
- Situation Due Diligence
- Report to stakeholder
3-4 months
- Appointment of Enercor to JV board
to represent private shareholder
5-7 months
- Mitigation of corporate conflict
- Negotiations with management
- Negotiations with shareholders
8th month
- Assets sold to planes producer